There's no need to stop the ordinary workflow of a CSSD when replacing an old trolley washer with its latest version.
That's what happened in Merano hospital, Italy: our staff worked alongside the CSSD operators to remove the old LC 20 and replace it with its new-generation model. Reprocessing workflow was never stopped or slowed down, and outsourcing was not necessary.
If you also need to renovate some of your CSSD equipment, contact your Steelco referee.
🔹 WEBSITE https://www.steelcogroup.com/
🔹 LINKEDIN / steelco-group
🔹 FACEBOOK / steelcogroup
🔹 INSTAGRAM / steelcogroup