Tesla Gigafactory Texas | 8-9-24 | new canopies @railyard + ongoing prep work @BoringCo. tunnel.

Опубликовано: 10 Август 2024
на канале: Airwave Dynamics
6,211
328

*If you like the video and want to help contribute:
https://buymeacoffee.com/airwavedynamics

[1] Newly installed canopies for #GigaTexas' parking lot at railyard in Taylor/Hutto.

[2] Lots of railroad activity with Switchers (local engines used in the yard), connecting/disconnecting Strings (line of connected trains), and a glimpse of Union Pacific's Road Engine entering the yard with a short String. Plus views of Teslas being loaded into autorack train cars.

[3] Preparation work continues for #Cybertunnel, which will connect the end of Cybertruck's production line to the logistics site for shipment and deliveries.

[4] Extra video footage from last month that was unpublished (b-roll).

#TeslaRailyard is located at RCR Taylor Logistics Park, which transports newly built vehicles from Tesla Gigafactory Texas, to all points N/S/E/W.

The Boring Company creates safe, fast-to-dig, and low-cost transportation, utility, and freight tunnels. The mission: solve traffic, enable rapid point-to-point transportation and transform cities.

Gigafactory Texas is an automotive manufacturing facility in Austin, TX., built by Tesla, Inc. A 2,500 acre facility along the Colorado River that produces the Model Y and Cybertruck EVs.