CHALLENGES of Offshore Wind Power Installation - Modern High Voltage Cable Manufacturing Technology

Опубликовано: 20 Декабрь 2023
на канале: MACHINERY & TECHNOLOGY
520,192
1.8k

CHALLENGES of Offshore Wind Power Installation - Modern High Voltage Cable Manufacturing Technology

With the rapid increasing size of Wind Turbine Generators, the transportation and installation of offshore wind farms is becoming a big challenge in the complex logistics around increasing the offshore energy production. Currently the capacity is around 9MW per installed turbine, which is expected to increase to 11MW next year. Furthermore, the latest turbine models being displayed by the major manufactures will increase further to 15MW within 5 years

🔔 Thanks for watching my videos, enjoy, and subscribe for more interesting videos!
   / @machinerytechnology